LORING provided complete HVAC, electrical, plumbing and
fire protection engineering services for the design and construction
administration of a five story, 90,000 sf educational facility. (Project was
design-build)
Heating is provided by two 100 bhp gas/oil steam boilers.
These boilers provide low pressure steam to perimeter radiation. They also
provide low pressure steam to heating coils in the various air handling
units serving the building.
Chilled water (44 deg. F.) is provided to the air
handling units for cooling by two, 150 ton electric reciprocating chillers
with remote air cooled condensers.
Main electric service is from a 4,000 amp Con Edison
service. A main switch board provides 208/120 power to equipment and
lighting. A 300 KW emergency generator has been provided to power life
safety.